News
04 June 2019

ADB agrees $311m financing for Bangkok metro lines project

In:
Social infrastructure
Region:
Asia-Pacific

The Asian Development Bank signed a financing package worth THB9.9 billion ($311 million equivalent) for the construction and operation of the Pink and Yellow lines of Bangkok’s mass rapid transit (MRT) system. 

ADB’s financing package is comprised of two THB4.95 billion loans to the Northern Bangkok Monorail Company Limited (NBM) and the Eastern Bangkok Monorail Company Limited (EBM).

The Pink Line, under NBM, will operate between Min Buri district in Bangkok and Khae Rai in Nonthaburi province, with a total length of about 34.5km. EBM’s Yellow Line will operate between Lat Phrao in Bangkok and Samrong in Samut Prakan province with a total length of about 30km. 

NBM and EBM are special purpose vehicles established by BSR Joint Venture (BSR) to operate the Pink and Yellow MRT lines, respectively. BSR is a joint venture comprising BTS Group Holdings Public Company Limited, Sino-Thai Engineering and Construction Public Company Limited, and RATCH Group Public Company Limited.

You might also like


Roundtable
03 September 2024

Funding African development: Could it be faster, more...

Cost of debt and mobilisation of private capital for Africa – could both be done better and cheaper? It’s a $170 billion per year question according to estimates from the OECD...

Perspective
06 September 2024

Lobito Corridor: Spreading the benefit?

The Lobito Corridor Railway project is progressing, with more than enough funding raised for its initial needs. But questions still remain over whether DFIs should be backing...